Günther Zäpfel, Michael Wasner,
"An integrated assembly line scheduling and personnel assignment model with M-parallel flow lines including a real-life example"
, in Grubbström, R. W. / Hinterhuber, H. H.: Pre-Prints of the Sixteenth International Working Seminar on Production Economics, Vol. 1, Seite(n) 507-518, 3-2010
Original Titel:
An integrated assembly line scheduling and personnel assignment model with M-parallel flow lines including a real-life example
Sprache des Titels:
Englisch
Original Buchtitel:
Pre-Prints of the Sixteenth International Working Seminar on Production Economics